Demo — fictional data. Sources are simulated.
Programme Oversight
Role:Helen Carter — LeaderDemo date: 20 Oct 2026, 10:00

Records not loaded — Delivery tracking (second instance)

Connection lost. Figures on this page do not include the latest data from Delivery tracking (second instance) (DT-C). Use Retry on this source in Administration → Data sources.

On-time rate

Every milestone with a plan baseline due date before the reporting cutoff, including earlier months, counting those completed on or before that due date. Incomplete or late milestones are misses.

Definition v1 · published 1 Mar 2026

Scope: Finance Systems Renewal · General ledger migration · Show the whole programme · Show all programmes

100%Met / Due: 7 / 7
Includes 1 of 1 projectsLoaded at09:58Data as of20 Oct 2026

As of 20 Oct 2026 (cutoff)

Definition and formula

Definition v1

Formula
On-time rate = Met ÷ Due (all milestones due before the cutoff; numerators and denominators pooled, never averaged)
Target
90%
Thresholds
  • · No status threshold — target only

Comparison and source

Previous month and the systems behind the number.

Previous month (Sept 2026)
100% → 100%
Data source
Delivery tracking (main)Loaded at09:58Data as of20 Oct 2026

Provenance and audit

Where this number came from, and which published versions produced it.

Quality: Complete — All records in scope contributed.

Reporting cutoff
20 Oct 2026
Last calculated
20 Oct 2026, 10:00
Definition version
Definition v1
Threshold version
Not applicable
Plan baseline version
Plan baseline v1
Configuration version
Version 1
Contributing records
7
Records excluded
0
  • Delivery tracking (main) · batch DT-MAIN:initial (version 1) · Loaded at 2 minutes ago · Data as of 20 Oct 2026

Full provenance for each record is on its record page.

Contributing records

These records reproduce the total. Met / Due.

RecordProjectMet / DueDetail
General ledger migration milestone 63DT-MAIN · DT-401-M063General ledger migrationMetDue 5 Apr 2026 · Completed 4 Apr 2026
General ledger migration milestone 66DT-MAIN · DT-401-M066General ledger migrationMetDue 6 May 2026 · Completed 5 May 2026
General ledger migration milestone 69DT-MAIN · DT-401-M069General ledger migrationMetDue 7 Jun 2026 · Completed 6 Jun 2026
General ledger migration milestone 72DT-MAIN · DT-401-M072General ledger migrationMetDue 8 Jul 2026 · Completed 7 Jul 2026
General ledger migration milestone 75DT-MAIN · DT-401-M075General ledger migrationMetDue 9 Aug 2026 · Completed 8 Aug 2026
General ledger migration milestone 78DT-MAIN · DT-401-M078General ledger migrationMetDue 10 Sept 2026 · Completed 9 Sept 2026
Chart of accounts frozenDT-MAIN · DT-401-M082General ledger migrationMetDue 6 Oct 2026 · Completed 5 Oct 2026

Exclusions

Records held for review, not linked to a project, not in USD, or without an approved budget.

Nothing excluded this month.