Programme Oversight
Role:Helen Carter — LeaderDemo date: 20 Oct 2026, 10:00
← Back to Network Modernisation

Records not loaded — Delivery tracking (second instance)

Connection lost. Figures on this page do not include the latest data from Delivery tracking (second instance) (DT-C). Use Retry on this source in Administration → Data sources.

Edge site rollout

Accountable owner: Maria Keller · Part of Network Modernisation · Plan baseline v1 · As of 20 Oct 2026

Programme statusRed· partial data

Status is reported for the whole programme, never per project.

  • · overdue critical milestone
  • · high risk

Budget and forecast

Forecast final cost against approved budget, pooled over the projects in view. Actual spend is reported separately and is never part of the variance.

Loaded at02:00Data as of19 Oct 2026
Approved budget0USD
Forecast final cost0USD
Forecast over / under budgetNot available
Actual spend to date60,000USDNot included in the variance
Includes 0 of 1 projects · Partial (1 missing)
  • Edge site rollout — not included (missing forecast), forecast Not available
Actual spend · As of 20 Oct 2026Includes 1 of 1 projects

Contributing metrics

Each metric opens scoped to this project.

Milestones

Met / Due: 0 / 0. Due dates come from the plan baseline in effect at the cutoff.

Loaded at09:58Data as of20 Oct 2026
Includes 1 of 1 projects
MilestoneProjectOwnerPlan baselineDueCompletedFlagsDays overdue
Edge site design approvedEdge site rolloutMaria Kellerv110 Nov 2026——
First edge site liveEdge site rolloutMaria Kellerv15 Dec 2026——

Blocked work

Tasks waiting on this, by severity then age.

No blocked work

High risks

Risk score (likelihood × impact) ≥ 15, open at the cutoff.

No high risks